Notable Project References



King Abdullah University Science and Technology – Integrated Campus Automation System (“ICAS”)
Completion of Phase 1 of ICAS for the integration of 29 buildings MEP, Information and Communication Technology Systems and Security System. Proactive involvement on project costing, planning, development of design specification, system configuration, test documents, implementation, coordination with various subsystem vendors and clients. Leading 30 people project teams in London, Paris and Kingdom of Saudi Arabia on detailed design and implementation stage.
Sofitel Central Grand Hotel Bangkok, Thailand
Design, planning and installation of the Building Automation System for a 5-star hotel.
Changi Airport, Singapore
Provides technical support for the Barber Colman Building Automation System (BAS). Design, planning and customised the alarm console driver for the integration of Building Automation System.
Zhulian Factory Plant, Penang
Provides engineering and technical support in installation of the Building Automation System. Applied the system using EASYIO automation controller module.
Central Plaza, Kuala Lumpur
Upgrade the existing Barber Colman Building Automation System (BAS) into latest Tridium Niagara AX® software, feature with web browser and alarm SMS enable technology.
Troika Project, Kuala Lumpur
Design, planning and installation of the Building Automation System for 3 blocks multi storeys condominium with a podium located at KLCC, Kuala Lumpur.
Wisma Putra, Putrajaya
Upgrade the BAS system using more than 500 units of EASYIO automation controller module.
MGM Grand, Macau
Supplying the more than 100 unit of EASYIO Sedona for the Huge Chiller Plant Automatic Control System.
Prince’s Building Chiller Plant Automatic Control System, Hong Kong (Ongoing)
Project Management for Chiller Plant Automatic Control System installation, Software Engineering, Graphic Development and Testing and Commissioning for existing 26 floors commercial building located in prime location of Central District, Hong Kong using EASYIO Ax Supervisor, J6, 30P Sedona.
Hong Kong Land Central Monitoring Centre, Hong Kong
Project Management for integration of existing Building Automation System, Fire Alarm System, Chiller Plant BMS and Central District Sea Water Pump System in 12 buildings located in prime location of Central District, Hong Kong using EASYIO Ax Supervisor, J6 and drivers for legacy systems.

1
One Exchange Square
7
Alexandra House
2
Two Exchange Square
8
Gloucester Tower
3
Three Exchange Square
9
Edinburgh Tower
4
The Forum
10
York House
5
Jardine House
11
The Landmark Atrium
6
Chater House
12
Prince’s Building
Hong Kong Baptist University, Hong Kong
Supply EASYIO Ax Supervisor, J6, 30P and drivers for legacy systems for integration with existing BMS and new BMS installation in multi buildings campus located in Kowloon, Hong Kong.